01. Shave more than 100 kW of peak demand from 6 a.m. to 6 p.m.
02. Back up the full load and integrate the generator during grid failure.
03. Shorten the investment payback period.
— Solar array — 240 kWp
— PCS + MPPT — 250 kW
— Battery system — 645 kWh (768 V / 280 Ah × 3 sets)